customercare@ciaservices.com  |  Toll Free 866-219-0563  |  Houston 713-981-9000  |  San Antonio 210-490-0000
C.I.A Services, Inc.
Systems. Structure. Stewards.
Professional Community Association Management Since 1984
Lake McQueeney Las Brisas Homeowners Association is another extraordinary community managed by C.I.A. Services
news & events
Lake McQueeney Las Brisas Homeowners Association

Jul 2018 News

Lake McQueeney Know your lake - be safe!

Click here for Lake McQueeny map.

Internet Fiber to the Home

Internet Fiber to the Home

Guadalupe Valley Electric Cooperative (GVEC) is installing fiber for high speed internet services throughout the community. Residents will be able to sign up for service with up to 1 GB speeds.

The work will start at the end of May. Residents will receive about 1 week of advance notice before work is done in their area. Crews will be accessing the front and side utility easements to include work such as line marking, trenching, boring and setting underground junction boxes. They will be installing small services boxes on homes below the electric meter.

The GVEC Customer Service Manager to contact for questions is Jeff Bowles at 800-699-4832 x8315.

FOLM/GBRA - April 24, 2018 Update

FOLM/GBRA - April 24, 2018 Update

(The photo is of the Lake Wood Dam after the catastrophic gate failure in 2016.)

In 2016, one of the gates on the Lake Wood Dam was damaged beyond repair when there was relatively low flow. The chain reaction began with a failure of the top brace of one side. Next, the other top braces broke, this was followed by internal pressure causing the entire gate to break loose from its concrete foundation. The damage to the gate made the entire dam totally unusable for its intended purpose. (See photo.)

Acatastrophic failure on one section of the gates on Lake McQueeney, similar to Lake Wood’s gate, could result in injury or death to personnel downstream,especially those on Lake Placid, not to mention property damage and years of repair/replacement. There is mainly farmland below Lake Wood.

FOLM has coordinated for months on the options available, such as working on Lake Gonzales first (up to 9 months work) this summer followed by McQueeney; however in the occurrence of a highwater event, the risks of losing a gate would be catastrophic for years. There are no good options worth the risk.

Following the 2016 failure of the H-5 “Lake Wood” Dam, leadership at GBRA began a process of repairing the gates at the hydroelectric dams:

  • Replacement of both gates at Lake Wood Dam with modern hydraulic crest gates is estimated to be nine million dollars and take 2 years to construct/install.

  • GBRA’s sole source of revenue for operating, maintaining, and replacing gate infrastructure is from the sale of hydroelectric generated electricity to GVEC.

  • GBRA currently does not have the funds or revenue from the sale of electricity to fund the replacement gates at Lake Wood or the other dams. Current repairs are funded from a temporary GBRA intra-fund loan.

  • GBRA Engineers were asked by management to complete repairs on the 90-year-old existing dams to replace the components that failed at Lake Wood in order to preserve the lakes and GBRA’s ability to generate/sell hydroelectricity. The engineers also recommend order of repair on the dams based on concerns of failure. In order of priority was Lake Nolte, Placid, McQueeney, and Gonzales. Lake Dunlap’s has already had repairs in 2010 and 2012.

  • Work began on gates on Lake Nolte and Placid in August 2017 with the expectation all dams would be completed prior to Memorial Day 2018; however, delays due to Hurricane Harvey and other weather conditions/needs of each gate has continued to push the time frames longer.

  • The repairs also include replacement of structural steel inside the dam which is based on an evaluation by a structural engineer once there repair crews are inside the dam. Because the amount of replacement steel needed is not known in advance, a detailed schedule for completion at each dam cannot be generated.

  • Repairs at McQueeney will take at least 6 months and could be much longer depending on weather delays and the amount of steel to replace.

  • Currently the National Weather Service (NWS) indicates we are in an El Nino pattern, which usually means drier conditions for our area; however, NWS is also predicting a shift towards a La Nina pattern this fall which trends towards higher rainfall for our region. Due to the current lower flows, now is an opportune time to complete the work, where as if delayed until fall, chances of heavy rains or flooding increase, as does a failure similar to gates on Lake Wood.

  • GBRA does not recommend delaying the work schedule. An event similar to the floods in past years could trigger such a failure.

  • If the work on Lake McQueeney is delayed and work begins on Lake Gonzales, it could be six to nine months or later before work on McQueeney begins, and that could take well over six months and go into the summer of 2019.

  • With the water down 18" – 24”, more than 50% of the lake is navigable.

  • The Lake McQueeney Dam estimated date for repairs may be as early as May 29, 2018.

  • A 30-day notice will be provided by GBRA when they have a firm start date.

Lake McQueeney Dam Repairs

Lake McQueeney Dam Repairs

From your Friends of Lake McQueeney Board of Directors:

FOLM continually works with GBRA (Guadalupe Blanco River Authority) to improve conditions on the lake. GBRA has begun repair activities on area lakes, spill gates, and dams to address critical components that are in need of immediate repair. Due to the nature of these repairs, a strict timetable of work expected for each spill gate has not been feasible, but work is expected to take at least six months at each dam.

Based on the current progress, GBRA believes repairs at Lake McQueeney will begin as soon as the end of May. To assist affected property owners in planning for lowered lake levels, GBRA will begin lowering the lake on Tuesday, May 29, 2018. The lake level is expected to be down 18-24 inches for the duration of the repair activities. The main river channel should be available for activity. We appreciate your understanding of the situation.

To read the entire article, click here.

New Management Company

New Management Company

The Board of Directors recently solicited proposals from several companies to provide management services for the community. After a detailed review and interviews, the Board has selected C.I.A. Services effective February 1st.  

C.I.A. Services will provides a full range of services under the direction of the Board including administrative services, billing & collections, financial management, compliance services, maintenance administration and gate operations.

Jul 2018
Events Calendar

«
»
S
M
T
W
T
F
S
1
2
3
4
5
6
7
8
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
Home  |  Community Information  |  Community Documents  |  Key Personnel  |   Become a Volunteer   |  Question? Request?  |  News & Events  |  Pay Assessments  |   Contact Us
C.I.A. Services Home Page
Admin Login  Board Login
Copyright 2011 - 2018 C.I.A. Services, Inc. All rights reserved.